Air Handling Unit Flat Packing
Our units can be flat packed and reassembled in place for when access on-site is challenging.
Your unit will be designed specifically with a construction that can be broken down to suit the access limitations.
We can attend the site to survey, advise and assist if necessary.
Our Process

Stage 1
Units are assembled & inspected in the factory.

Stage 2
They are then broken down to be suitable for access restrictions.

Stage 3
Framework is then assembled on-site.

Stage 4
Bulkheads are then added.

Stage 5
Panels & components are then installed.

Stage 6
The unit is then sealed & inspected ready for final connections.
Contact us for a bespoke design
Tell us what you need, and our designers will produce dimensioned sketches and a technical report for your approval.